That Staging Job Looked Profitable. Was It?

2 days ago
4 min read

The agent loved the photos, the seller paid the $3,200 invoice and the crew had already moved on to the next install. When Maya, the owner of a small staging company, looked at what she’d paid the crew and spent on the truck, the job seemed to have left her with nearly $2,000. It was the kind of project she would have happily quoted at the same price again.


Then she put the invoice beside her calendar, the crew’s time sheets and the warehouse schedule. By the time she’d accounted for everything from the first walkthrough to the moment the sofa was ready to go out again, that nearly $2,000 was down to $412.


Maya and the job are fictional. The numbers show how to do the same review with your own records.


The quote covered 30 days of staging


Maya quoted $3,200 before sales tax to stage the living room, dining room and primary bedroom of a vacant home. The price included installation, 30 days of furniture and accessories, and destaging. She spent five hours on the walkthrough, quote, furniture selection and scheduling before the truck left the warehouse.


On install day, two crew members worked eight paid hours each. That included pulling and loading inventory, travel, unloading and setting up at the property, and driving back to the warehouse. Maya spent another three hours on site directing placement and styling, then one hour over the course of the job on client communication and coordinating pickup. At $60 an hour, the internal rate she uses to value her own work, those nine hours cost the job $540.


One return trip used another morning


During installation, the crew discovered that the dining table base couldn’t clear the stairwell turn. Maya sent a smaller table the following morning, and the swap used four paid crew hours in total, plus another $60 in vehicle costs. She absorbed the expense because choosing furniture that fit through the access route was part of her scope.


When it was time to destage, the crew logged another 12 paid hours between them. Their time included driving to the property, packing and loading, and bringing everything back to the warehouse to unload. The job ended once the pieces were checked and ready for the next install, 38 days after Maya first set them aside. The client received the agreed 30 days on site. The extra eight days came from reserving the pieces before installation and turning them around after pickup.


What the job actually earned


Job cost

How Maya calculated it

Amount

Crew labour for install and destage

28 paid person-hours × $30, including payroll costs

$840

Crew labour for the return trip

4 paid person-hours × $30

$120

Vehicle costs

$180 for install and destage, plus $60 for the return trip

$240

Owner time

9 hours × $60

$540

Inventory use

38 days × $16 for the furniture and accessories committed to this job

$608

Share of business overhead

Allocation for warehouse rent, insurance and software

$440

Total job cost


$2,788

Amount left from the $3,200 fee

$3,200 − $2,788

$412 (12.9%)

Maya’s first look counted the crew and vehicle costs, which totalled $1,200. Once she included her own time, inventory use and a share of overhead, the job still earned money, but there was considerably less room for another delay or a repair.


The $16 daily inventory rate is Maya’s internal allowance for wear and eventual replacement. She counts the days from reservation through readiness for reuse because another job can’t book those pieces during that time. If a second project actually needed the same set and she had to rent a substitute, she’d record that rental on the job that used it. She’d also flag the scheduling conflict when reviewing how long she holds inventory before and after each install.


A warehouse with staging furniture
A warehouse with staging furniture

Review your last three jobs before setting your 2027 prices


Pick the last three jobs you’ve fully destaged and give each one a column on a sheet of paper or in a spreadsheet. Pull the invoice, your calendar, the crew’s time records and the inventory schedule. If you have to reconstruct an hour from a text thread or estimate when a sofa went back into rotation, mark it as an estimate so you know what to start tracking.


  1. Record the fee you earned. Use the amount before sales tax and account for any discounts, credits or separately billed extensions.

  2. Rebuild the hours and trips. Write down your own time from walkthrough to final client follow-up, then total the paid hours for each crew member. Include warehouse prep, loading, paid drive time, install, return visits and destage. Add vehicle costs for each trip.

  3. Count the days each set was committed. Start when you pulled it from available stock and stop when it was ready to go out again. Apply your inventory allowance and a consistent share of overhead, with each expense counted once.

  4. Subtract the costs and circle what keeps repeating. Divide the amount left by the fee to get the margin. If all three jobs used more paid loading and travel time than you allowed for, build those hours into your base price. If inventory regularly stayed on site past the included term, review how you price and confirm extensions. If the same access problem caused repeat trips, add an access check to your walkthrough.


Start with the line item that keeps surprising you. It gives you something specific to change in your next quote and something concrete to check when that job comes back to the warehouse.


Further reading from IAHSP®



IAHSP® - The International Association of Home Staging Professionals® - is the global industry association serving members from around the world. It is the oldest industry trade association founded on the three pillars of Excellence Education and Ethics. IAHSP® set the standard for those who qualify as a professional home stager and is the ONLY industry association that requires education from a qualified source in order to join. IAHSP® provides resources, education, events, partnerships with vendors for savings on business services and products for professionals who own and operate businesses serving home sellers, real estate agents, builders and property investors. Click here for more information about our history.


 
 
 